200 Park Ave • San Jose, California
- rosa788
- Jul 24, 2021
- 1 min read
Curtain Wall Design-Build: Permasteelisa
Curtain Wall Installation Consulting: Deternoz Engineering, P.C.
(516) 623-2534 | info@deternozengineering.com
19-Story Tower in Central Urban Location in the heart of downtown San Jose. Highly-efficient. 54,000 sf Floor. 25,000 sf of Outdoor Sky Terraces integrated with Light Canyons and Open Floor Plan.

Comments